Active Capital Projects
The currently active capital projects for the 2011 – 2013 biennium are listed below, with their project name, project scope, and construction status.
|
Project Name |
Project Scope |
Construction Status |
|
1000 Building Transformer/ Distribution Panels Replacement |
Replace 45 year old underground transformer/distribution panel and associated electrical panels. Install emergency generator for building.
|
Fall 2012 construction schedule. 1000 building outage will be coordinated before it is scheduled.
|
|
3000 Building HVAC Controls Replacement
|
Replace current original pneumatic controls with digital/DDC controls and wiring.
|
Work scheduled for Fall 2012. |
|
Visitor's Parking Lot - ADA Improvements |
Construct new ADA accessible walkway/ramp in the Visitor's Parking Lot and restripe parking spaces to meet code requirements.
|
Construction scheduled to begin October 8, 2012. |
|
Roof Study and Repairs |
A roof study will be performed, with the highest priority building being 2100 Automotive.
|
From roof study, the original 2100 building roof needed to be replaced. Construction is scheduled for Fall 2012.
|
|
Master Planning |
Complete an approved Master Development Plan with the City of Shoreline. Complete a Long Range Development Plan that will be used to guide our facilities capital planning and funding efforts with the State.
|
Schacht/Aslani Architects is leading this effort. |